
|
Blanking Cap & Plug Pump In Sub |
|
ACT Blanking Cap & Plug
ACT Blanking Cap and Blanking Plugs are used for installing gauge and / or Bleed Off Valve. They are
available for use on all Quick Unions, and are equipped with NPT ports.
ACT Pump-In Sub
The Pump-In Sub is placed between wireline BOP and the Wellhead. It is basically used to pump the fluid in well when wireline BOP is closed. Pump-In Sub can also be used for injection of inhibitors and for collecting samples. It has top and bottom with Quick Union Connections and side outlet with Wing Union Connection.
| Engineering Data for Pump-In Sub |
| ID |
W.P. (PSI) |
SERVICE |
| 2-1/2 |
5,000 |
STD |
| 2-1/2 |
5,000 |
H2S |
| 2-1/2 |
10,000 |
STD |
| 2-1/2 |
10,000 |
H2S |
| 3 |
10,000 |
STD |
| 3 |
10,000 |
H2S |
| 4 |
10,000 |
H2S |
| 5.12 |
10,000 |
H2S |
| 6-3/8 |
10,000 |
H2S |
|
 |
|
|