
|
Size 20 Wireline Setting Tool Assembly Instructions |
|

1. Install O-rings And Manual Bleeder Valve (3 And 18) In Pressure Chamber (2). Screw Chamber To Cylinder (5).

2. Install O-rings (3) On Upper Piston (4) Then Push Piston Through Cylinder Until It Contacts Pressure Chamber.

3. Fill Cylinder with SAE 10-40 Oil to Following Levels:


4. Install O-rings (3) On Tandem Connector (6) Then Screw Into Upper Cylinder With Small Orifice Toward Oil.

5. Slide Setting Mandrel (17) Inside Crosslink Sleeve (16). Long Threaded End Of Mandrel Positioned as Shown.

6. Slide Piston Rod (9) Into Setting Mandrel (17)

7. Align Slots In All Items And Insert Crosslink (15). Install Retaining Ring (13) And Cap Screw (14).
8. Install O-rings (3 And 10) To Cylinder Head (11). Slide Head On Piston Rod. Make Up Head Hand Tight To Setting Mandrel. Install Set Screw (12).

9. Install O-rings (3) On Lower Piston (7). Place Piston On Piston Rod. Install Lock Pin (8) And Tighten.
10. Lubricate Piston, Cylinder Head Threads, And Cylinder Bore. Slide Cylinder Over Piston And Make Up To Cylinder Head While Making
Sure Cylinder Head Is Positioned Against Crosslink Sleeve While Cylinder Is Being Made Up.

11. Connect Upper and Lower Halves of the Tool Together.
12. Place Tool In Vise And Tighten All Joints. Air Trapped In Cylinder During Tightening Should Make
Crosslink Sleeve Stand Off From Cylinder Head No More Than 3/8".
|
|